Huge Project – Small Footprint — The U.S. Route 14 Grade Separation
Imagine a construction site the size of a few city blocks that is receiving a new railroad bridge, two new massive box culverts, a 45-foot-deep pump station, retaining walls, a relocated waterway, and a new 4-lane highway—where beginning the construction of each item is dependent on something else finishing first. The U.S. Route 14 Grade […]