Posts
- Improving a Chicago Treasure – Historic Drexel Boulevard
- Stormwater Management – A Tale of Two Cities
- Creating a Sanctuary for Children
- Halloween with Civiltech
- Drone and Tell
- Civiltech’s Digital Rendering Team
- Civiltech and the Extricators of the Lost Vessel
- Public Involvement at Civiltech
- Thinking Big at the Morton Arboretum
- The Longmeadow Parkway New Alignment Roadway and Reconstruction Project
- Civiltech Secured over $3 Million for Clients over the Past Year
- Shivertech the Snowman
- Rockland Road – A Virtual Shadow Day
- Moving Freight: A Comparison of Two Truck Routing Studies
- Civiltech Strives to Give Back
- Civiltech Named A Best Firm To Work For
- Forging a Path for Women in Engineering
- Civiltech Named A Top Design Firm
- Enhancing a Downtown through Creativity and Collaboration: Naperville Downtown Streetscape Improvement
- Civiltech Leads Tollway 3D Design Project
- Celebrating 30 Years
- Reaching New Heights: A Look at Civiltech’s Drone Program
- A Professional Journey: Becoming a Right of Way Appraiser
- The Latest Chapter in the Long Grove Covered Bridge Story
- Civiltech Ranks Among Top Design Firms
- Our COVID-19 Response
- A Winning Awards Season
- Securing Project Funding: Civiltech helped our clients secure over $21 Million in 2022
- Expanding Our Expertise
- Using GIS to Improve Roadways Across Chicago
- Civiltech/C*NECT assists City in Receiving Federal Bridge Investment Program Funds
- 50 Fun Facts About Civiltech
- IL 390 Opening
- Rendering a Downtown Streetscape Improvement
- Chicago Scholars Diversity Award
- Safely Bridging the Gap
- Civiltech Congratulates Anmol Shrivastava, P.E., PTOE, RSP, on the Completion of the 2022 LeadershipITE Program
- Repurposing Street Maintenance Programs
- Saying Goodbye to our Summer Interns
- ASCE YMG Bags Tournament
- Identifying Wetlands – The Role of Civiltech’s Environmental Scientist
- An Intern’s Journey
- The Benefits of Hydrologic/Hydraulic Modeling: A Case Study
- A Confluence of Expertise: Teamwork in Berkeley
- Engineering a Way Out of the Mud on US Route 6
- Civiltech Ranks Among “Best Engineering Firms to Work For” in Illinois
- Assisting Agencies with Program Management Services
- Today’s Technology: Tomorrow’s Roads
- Celebrating Bob Andres’ Career
- Capturing the Vision and Aspiration of the Jackson Park Transportation Improvements Project
- A Landmark Project Moves Forward
- Connecting & Collaborating
- Civiltech Named ISPE 2021 Best Place to Work
- Noise Monitoring along Jean Baptiste Point DuSable Lake Shore Drive
- Connecting Communities – The Audrey Nixon Boulevard Reconstruction
- Middlefork Savanna Trail Connection Wins Award
- Providing Community-Driven Experience-Based Learning Opportunities
- Knowledge Sharing At Civiltech
- Chicago Scholars Event
- Civiltech Project Recognized for National Pedestrian Safety Month
- Collaboration is Key: Working Together for a Successful Project Outcome on the Randall Road Reconstruction Project
- Capturing History: Section 106 Historic Properties Identification Report for North DuSable Lake Shore Drive
- Work in the Time of COVID
- Civiltech Named A Top Design Firm
- Rockland Road Improvement Project – APWA Lake Branch Award Winner
- Transportation Planning – Collaboration across Disciplines
- Extensive Improvements on a Heavily Traveled Arterial
- Take Your Child to Work (From Home) Day
- Honoring Earth Day Through Sustainable Hobbies and Practices
- Civiltech and Illinois Tollway Project Receives ACEC IL Honor Award
- Representing His Community in an Official Capacity
- Traffic Fairies, Flying Vehicles, Roller Coasters, and Sustainable Houses: Civiltech’s Next Generation of Girls in Engineering
- Capturing Data From the Sky
- Improving Bicycle and Pedestrian Safety in Milwaukee
- Improving Pedestrian Safety through CDOT’s Arterial Street Resurfacing Program
- Celebrating Change
- Analyzing Bus-Only Lanes in Two Extensive City Corridors
- MERGE: Civiltech’s Women’s Affinity Group
- Insights from Civiltech’s Drone Pilots
- Improving Depression-era Infrastructure with the WPA Streets Program
- Civiltech Congratulates Jennifer Hyman, P.E. on the completion of the IRTBA Emerging Leaders Program
- Making Science Fun and Practical
- Halloween Fun Prevailed!
- 3D Deliverables
- Civiltech’s Two Years of Unprecedented Growth
- From Schaumburg to South Haven by Bike (and a Ferry Ride)
- On the Road with Civiltech’s Transportation Planning Team
Pages
- News
- Home
- Hugh Gilgunn, P.E.
- Senior Structural Engineer
- Transportation Engineer
- Transportation Design
- Traffic Engineering
- Civil Engineering
- Construction Engineering
- Environmental Studies
- Water Resources
- Structural Design
- Right of Way
- Engineer V | Phase I
- Transportation Planning
- Program Management
- Structural Engineer I
- Engineer III | Phase I
- Contact
- Joel Christell
- Tony Rossi
- Protected: Bidding Information
- Chris Wolff
- Phil Hurst
- Stacey Sequeira
- Urban Design
- Engineer I | Phase II
- Jim Woods
- Engineer II | Phase II
- Jon Vana
- People
- Corporate Social Responsibility
- Kyle Mishler
- Bob Atchison
- Mary Young
- Kung-Wei (Jerry) Chen
- Derek Mall
- Construction Inspector/Technician
- Dave Kreeger
- Jim Ewers
- Prequalifications
- Mike Folkening
- Sven Zimdahl
- Joe Emry
- Greg Hatlestad
- Jeff Lange
- Brian Carroll
- Engineer IV | Phase I
- 35 Signs of Kindness
- Tom Liliensiek
- Dave Bugaj
- Engineer I | Phase I
- Art Politowicz
- Dave White
- Mateen Baig
- Resident Engineer I | Phase III
- Bob Andres
- Kristen Hahn
- Brandon Bogenschutz
- Engineer III | Phase II
- Current Opportunities
- Jacque Henrikson
- Transportation Planner II
- Phil Hutchinson
- NEPA Practitioner
- Privacy Policy
- Kristin Kalitowski
- Petro Kravets
- Administrative Assistant
- Jack Ringness
- Amanda Kleinwachter
- Steve Pautsch
- Brad Hurban
- Jen Hyman
- Jim Tibble
- Brent Giesen
- John Vogelman
- Shirley Choi
- Maddie Johnson
- Cary Chan
- Ernest Williams
- Erich Kutschke
- Eric Konrad
- Transportation Engineering Services
- Projects
- Nick VanderZwan
- About Us
- Senior Transportation Engineer
Projects
- Rand Road Sidepath Central Road to Elk Boulevard
- Argonne Drive Phase I Study
- State and National Parkway Roadway Reconstruction
- CDOT Program Manager Consultant – Complete Streets Projects
- Park/Sheehan Pedestrian Safety Improvements
- Nell’s Woodland – North Bridge
- U.S. Route 41 (Skokie Boulevard) and Lake Avenue Intersection Improvement
- Tri-Trails Connector Phase I Study
- Transportation Planning – North DuSable Lake Shore Drive Phase I
- U.S. Route 14 Grade Separation at CN/EJ&E Railway
- Church Street Bicycle and Pedestrian Improvements
- Longmeadow Parkway Roadway Widening and Reconstruction Improvement
- North DuSable Lake Shore Drive: Northern Terminus Traffic Study
- Villa Park Grant Assistance
- Randall Road Reconstruction Project
- Pennsylvania Avenue Improvements; Central Business District (CBD) Streetscape and Utility Improvements
- U.S. Route 6 over Marley Creek
- City of Highland Park: Storm Sewer Master Plan Update
- Rockland Road Corridor Flood Reduction Project – Remaining Phases
- Montgomery Road Bridge Reconstruction
- White Pines Subdivision Water Main Rehabilitation
- Various Municipalities: Municipal On-Call Traffic Engineering
- Darrell Road Phase I Study
- IL Route 83 Bike Path – Foster to Bryn Mawr
- South Cook County Truck Routing and Communities Study
- Moving Will County
- US 6 (159th St.) from US 45 to Will-Cook Road
- North York Road/Harger Road Intersection Improvement
- Church Road STP Improvements
- Multimodal Crash Analysis Study
- Lincoln Village Pedestrian and Bicycle Bridge
- Cicero Avenue Corridor Study
- Northcenter Town Square
- Roosevelt Road Water Main Replacement
- Lake Cook Road and Weiland Road Improvements
- Elmhurst Bicycle and Pedestrian Plan Update
- Various Traffic Signal Projects
- IL Route 31 Algonquin Western Bypass
- Rockland Road Improvement Project
- Bike Path Underpasses
- J.F. Kennedy Boulevard
- Elk Grove Business Park Drainage Study and Projects
- Woodfield Road Improvement Projects
- North DuSable Lake Shore Drive Phase I Study
- Reagan Memorial Tollway
- Master Bike and Active Transportation Plan
- Middlefork Savanna Trail Connection
- C*NECT
- Jackson Park Mobility Improvements
- Berkeley Flood Control
- Elgin O’Hare Western Access (EOWA) Mainline
- 14th Street Reconstruction
- Damen / Elston / Fullerton Realignment & Reconstruction
- Fullerton Avenue Streetscape Improvement
- Motorola Campus Redevelopment
- Oak Park Avenue Improvement
- Quentin Road
- Vision Zero: Year One
- York Road Bridge Over I-88
- U.S. 20 (Lake Street) at IL Route 59 (Sutton Road)