Projects Examples of Our Work We’re proud to share a variety of our projects. AllFeaturedTransportation DesignTraffic EngineeringCivil EngineeringConstruction EngineeringEnvironmental StudiesWater ResourcesStructural DesignRight of WayUrban DesignTransportation PlanningProgram ManagementNature-based Solutions Jackson Park Improvements — Obama Presidential Center Nature-based Solutions In-House Civil Engineering and Natural Resource Services Weiland Road over Relocated Buffalo Creek – Nature-based Solutions North York Road/Harger Road Intersection Improvement and Pedestrian Underpass – Nature-based Solutions Fairfield Road/IL Route 176 Junction Improvement – Nature-based Solutions Services Houbolt Road at I-80 DDI Interchange La Grange Road (US 12/20/45) over I&M Canal, ICG (CN) RR, S&S Canal and over ATS&F (BNSF) RR and the Des Plaines River City of Milwaukee – Rapid Implementation Improvements Darrell Road Phase II St. Charles Bicycle and Pedestrian Plan & Complete Streets Policy Addison Road Water Main Replacement Elmhurst City Centre Traffic Review and Signal Modifications In-House Civil Engineering Services Naperville Downtown Streetscape Village of Libertyville Bicycle Plan National Parkway – Golf Road to American Lane Reconstruction Project Cumberland Avenue Water Main Installation – Peterson Avenue to Devon Avenue City of Joliet – ADA Transition Plan City of Milwaukee — Department of Public Works — Safe Routes to Transit Phase I Chicago Department of Transportation — 111th Street – Cottage Grove Avenue to Ellis Avenue US Route 14 Grade Separation at CN Railway Nature-based Solutions Services IL 132 (Grand Ave.) from West of Sheehan Dr. to Munn Dr. Old Plank Road Trail Extension Feasibility Study State and National Parkway Roadway Reconstruction CDOT Program Manager Consultant – Complete Streets Projects Nell’s Woodland – North Bridge Argonne Drive Phase I Study Park/Sheehan Pedestrian Safety Improvements Rand Road Sidepath Central Road to Elk Boulevard Des Plaines River Trail Central Feasibility Study US 41 at Deerpath Road: Pump Station #38 Arlington Heights Road Improvements Rozanne Drive over Westwood Creek Bridge Replacement Tri-Trails Connector Phase I Study U.S. Route 41 (Skokie Boulevard) and Lake Avenue Intersection Improvement Church Street Bicycle and Pedestrian Improvements Transportation Planning – North DuSable Lake Shore Drive Phase I U.S. Route 14 Grade Separation at CN/EJ&E Railway Cook County Department of Transportation and Highways – Various Traffic Engineering Services Longmeadow Parkway Roadway Widening and Reconstruction Improvement Randall Road Reconstruction Project North DuSable Lake Shore Drive: Northern Terminus Traffic Study Villa Park Grant Assistance Pennsylvania Avenue Improvements; Central Business District (CBD) Streetscape and Utility Improvements U.S. Route 6 over Marley Creek City of Highland Park: Storm Sewer Master Plan Update Rockland Road Corridor Flood Reduction Project – Remaining Phases Montgomery Road Bridge Reconstruction Various Municipalities: Municipal On-Call Traffic Engineering White Pines Subdivision Water Main Rehabilitation Darrell Road Phase I Study Moving Will County South Cook County Truck Routing and Communities Study IL Route 83 Bike Path – Foster to Bryn Mawr US 6 (159th St.) from US 45 to Will-Cook Road North York Road/Harger Road Intersection Improvement Church Road STP Improvements Multimodal Crash Analysis Study Lincoln Village Pedestrian and Bicycle Bridge Cicero Avenue Corridor Study Northcenter Town Square Roosevelt Road Water Main Replacement Lake Cook Road and Weiland Road Improvements Elmhurst Bicycle and Pedestrian Plan Update Various Traffic Signal Projects IL Route 31 Algonquin Western Bypass Rockland Road Improvement Project Bike Path Underpasses J.F. Kennedy Boulevard Elk Grove Business Park Drainage Study and Projects Woodfield Road Improvement Projects North DuSable Lake Shore Drive Phase I Study Reagan Memorial Tollway Master Bike and Active Transportation Plan Middlefork Savanna Trail Connection C*NECT Jackson Park Mobility Improvements Berkeley Flood Control Elgin O’Hare Western Access (EOWA) Mainline 14th Street Reconstruction Damen / Elston / Fullerton Realignment & Reconstruction Fullerton Avenue Streetscape Improvement Motorola Campus Redevelopment Oak Park Avenue Improvement Quentin Road Vision Zero: Year One York Road Bridge Over I-88 U.S. 20 (Lake Street) at IL Route 59 (Sutton Road) Start Your Project Today Our team is ready to work with you and provide all of the services that your transportation engineering project needs. Talk to Us to Get Started